Engineered die casting, investment casting and production.


die casting CASTINGS
investment casting

Manufacturing Facilities in South Korea, India & China
Click here for RFQ or to submit your drawings

CASTINGS BY PROCESS
Sand Molding
Carbon Dioxide Molding

Shell Molding

Cold Resin Molding
Lost Foam Process
Permanent Molding

Die Casting

Investment Casting

SAND MOLDING
APPLY TO FERROUS AND NON FERROUS CASTINGS. THE LEAST EXPENSIVE METHOD OF PRODUCING A MOLD.

S&K CAN PROVIDE SAND MOLDS TO YOU AS FOLLOWS
  HAND MACHINE AUTOMATIC
MOLDING PRESSURE LOW MEDIUM HIGH
DIMENSION TOLERANCE 1/8" PER INCH 1/16" PER INCH 1/32" PER INCH
SURFACE ROUGHNESS 1000 RMS 750 RMS -
500 RMS
250 RMS
MIN ORDER QUANTITY TO RUN 36,000 LBS OR 20 FT CONTAINER LOAD 36,000 LBS OR 20 FT CONTAINER LOAD 100,000 EA
MIN. UNIT WT 20 LBS 1 LB LB
MAX. UNIT WT 500 TONS 500 LBS 100 LBS

@ PATTERN MAKING TIME: 30 TO 45 DAYS
@ SAMPLE MAKING TIME: 15 TO 30 DAYS
@ THE FIRST PRODUCTION DELIVERY TIME: 60 TO 90 DAYS
@ MAXIMUM PRODUCTION PER MONTH: 1,200 TONS

CARBON DIOXIDE MOLDING
APPLY TO FERROUS AND NON-FERROUS CASTINGS.
MORE EXPENSIVE THAN SAND MOLDING BUT LESS EXPENSIVE THAN SHELL MOLDING.
THE GENERAL CASTING TOLERANCE IS +/- 1/16" TO 1/8" PER INCH. THE CASTING SURFACE ROUGHNESS IS 500 RMS TO 1,000 RMS.

@ MINIMUM ORDER QUANTITY: 36,000 LBS OR 20 FT CONTAINER
     LOAD TO GET THE MOST COMPETITIVE PRICE.
@ PATTERN MAKING TIME: 30 TO 45 DAYS
@ SAMPLE MAKING TIME: 15 TO 30 DAYS
@ THE FIRST PRODUCTION DELIVERY TIME: 60 TO 90 DAYS
@ MAXIMUM PRODUCTION PER MONTH: 1,200 TONS
 

SHELL MOLDING
APPLY TO FERROUS AND NON-FERROUS CASTINGS.
HIGH COST OF PATTERNS.
THE GENERAL CASTING TOLERANCE IS +/- 1/32" TO 1/16" PER INCH. THE SURFACE
ROUGHNESS IS 250 RMS TO 500 RMS.
@ MINIMUM ORDER QUANTITY: 36,000 LBS OR 20 FT CONTAINER LOAD TO GET
    THE MOST COMPETITIVE PRICE.
@ PATTERN MAKING TIME: 45 TO 60 DAYS
@ SAMPLE MAKING TIME: 15 TO 30 DAYS
@ THE FIRST PRODUCTION DELIVERY TIME: 60 TO 90 DAYS
@ MAXIMUM PRODUCTIONPER MONTH: 300 TONS

COLD RESIN MOLDING
APPLY TO FERROUS AND NON-FERROUS CASTINGS.
HIGH COST OF PATTERNS.
THE GENERAL CASTING TOLERANCE IS +/- 1/32" TO 1/16" PER INCH. THE SURFACE
ROUGHNESS IS 250 RMS TO 500 RMS.
@ MINIMUM ORDER QUANTITY: 36,000 LBS OR 20 FT CONTAINER LOAD TO GET THE
    MOST COMPETITIVE PRICE.
@ PATTERN MAKING TIME: 45 TO 60 DAYS
@ SAMPLE MAKING TIME: 15 TO 30 DAYS
@ THE FIRST PRODUCTION DELIVERY TIME: 60 TO 90 DAYS
@ MAXIMUM PRODUCTION PER MONTH: 500TONS

LOST FOAM PROCESS
APPLY TO MOST IRON CASTINGS AND SOME STEEL CASTINGS.
HIGH COST OF PATTERNS.
THE GENERAL CASTING TOLERANCE IS +/- 1/32" TO 1/16" PER INCH. THE SURFACE ROUGHNESS IS 250 RMS TO 500 RMS.
@ MINIMUM ORDER QUANTITY: 36,000 LBS OR 20 FT CONTAINER LOAD TO GET
    THE MOST COMPETITIVE PRICE.
@ PATTERN MAKING TIME: 60 TO 90 DAYS
@ SAMPLE MAKING TIME: 15 TO 30 DAYS
@ THE FIRST PRODUCTION DELIVERY TIME: 60 TO 90 DAYS
@ MAXIMUM PRODUCTION PER MONTH: 1,000 TONS

PERMANENT MOLDING
APPLY TO MOST OF NON-FERROUS CASTINGS AND SOME OF GREY IRON
CASTINGS. HIGH COST OF PATTERNS.
THE GENERAL CASTING TOLERANCE IS +/- 1/32" TO 1/16" PER INCH. THE SURFACE ROUGHNESS IS 250 RMS TO 500 RMS.
@ MINIMUM ORDER QUANTITY: 36,000 LBS OR 20 FT CONTAINER LOAD TO GET
    THE MOST COMPETITIVE PRICE.
@ PATTERN MAKING TIME: 60 TO 90 DAYS
@ SAMPLE MAKING TIME: 15 TO 30 DAYS
@ THE FIRST PRODUCTION DELIVERY TIME: 60 TO 90 DAYS
@ MAXIMUM PRODUCTION PER MONTH: 500 TONS
DIE CASTING
APPLY TO ALUMINUM ALLOY CASTINGS AND ZINC ALLOY CASTINGS. HIGH COST OF
PATTERNS. THE GENERAL CASTING TOLERANCE IS +/- 5/1000" PER INCH.
THE SURFACE ROUGHNESS IS 125 RMS TO 250 RMS.
@ MINIMUM ORDER QUANTITY: 10,000 EA
@ PATTERN MAKING TIME: 60 TO 90 DAYS
@ SAMPLE MAKING TIME: 30 DAYS
@ THE FIRST PRODUCTION DELIVERY TIME: 60 TO 90 DAYS
@ MAXIMUM PRODUCTION PER MONTH: 100 TONS

INVESTMENT CASTING
APPLY TO FERROUS AND NON-FERROUS CASTINGS.
HIGH CASTING PRICES.
THE GENERAL CASTING TOLERANCE IS +/- 1/128" TO 1/64" PER INCH.
THE SURFACE ROUGHNESS IS 125 RMS TO 250 RMS.
@ MINIMUM ORDER QUANTITY: 1,000 EACH
@ PATTERN MAKING TIME: 30 TO 45 DAYS
@ SAMPLE MAKING TIME: 30 DAYS
@ THE FIRST PRODUCTION DELIVERY TIME: 60 TO 90 DAYS
@ MAXIMUM PRODUCTION PER MONTH: 20 TONS









S K Industries, Inc.    
         TOLL FREE: 1- 888- 484- 4937
         TEL: 770-998-8989 -----FAX: 770-998-7486
555 Sun Valley Drive, Suite K-2- Roswell, GA 30076
relevant links